Dr BERNADETTE DEVILAT Bernadette.Devilat@nottingham.ac.uk
Assistant Professor
Dr BERNADETTE DEVILAT Bernadette.Devilat@nottingham.ac.uk
Assistant Professor
Dr Felipe Lanuza Felipe.Lanuza@nottingham.ac.uk
Data Collector
Diego Ramírez
Data Collector
DEVILAT, B. (2023, June). Reconstruction of housing after the 2010 earthquake in Chile. Challenges and Lessons from the Heritage Reconstruction Programme. Presented at i-Rec Conference 2023: Tensions Between Tradition and Innovation in Disaster Risk Reduction, Climate Action, and Reconstruction: Reflecting on Tohoku’s Recovery Twelve Years Later, Sendai, Japan
Presentation Conference Type | Conference Paper (published) |
---|---|
Conference Name | i-Rec Conference 2023: Tensions Between Tradition and Innovation in Disaster Risk Reduction, Climate Action, and Reconstruction: Reflecting on Tohoku’s Recovery Twelve Years Later |
Start Date | Jun 1, 2023 |
End Date | Jun 4, 2023 |
Acceptance Date | Feb 27, 2023 |
Online Publication Date | Jun 3, 2023 |
Publication Date | Jun 3, 2023 |
Deposit Date | Jul 5, 2023 |
Peer Reviewed | Peer Reviewed |
Book Title | Book of Abstracts: i-Rec Conference 2023: Tensions Between Tradition and Innovation in Disaster Risk Reduction, Climate Action, and Reconstruction: Reflecting on Tohoku’s Recovery Twelve Years Later |
ISBN | 978-2-9815234-1-9 |
Keywords | Earthquakes, Chile, reconstruction, heritage perception, evaluation, 3D laser scanning, LiDAR. |
Public URL | https://nottingham-repository.worktribe.com/output/22176309 |
Publisher URL | https://irides.tohoku.ac.jp/media/files/event/event/iRec2023/i-Rec2023_Abstracts.pdf |
Additional Information | Abstract published only. The full paper will be published as part of a monograph in preparation and to be published by Routledge. |
About Repository@Nottingham
Administrator e-mail: discovery-access-systems@nottingham.ac.uk
This application uses the following open-source libraries:
Apache License Version 2.0 (http://www.apache.org/licenses/)
Apache License Version 2.0 (http://www.apache.org/licenses/)
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2025
Advanced Search